10 Pelumba Terbaik LTDL 2011
1. Andrea Guardini (Farnese Vini-Neri Sottoli) 2 jam 14 minit 59 saat
5. Jang Chan Jae (Korea National Team) 2'14:59s
6. Andre Schulze (CCC Polsat Polkowice) 2'14:59s
7. Robert Foster (United Healthcare Pro Cycling) 2'14:59s
8. Taiji Nishitani (Aisan Racing Team) 2'14:59s
9. Alireza Haghi (Azad University Cycling Team) 2'14:59s
10.Mohd Nur Rizuan Zainal (Malaysia National Team) 2'14:59s
6. Andre Schulze (CCC Polsat Polkowice) 2'14:59s
7. Robert Foster (United Healthcare Pro Cycling) 2'14:59s
8. Taiji Nishitani (Aisan Racing Team) 2'14:59s
9. Alireza Haghi (Azad University Cycling Team) 2'14:59s
10.Mohd Nur Rizuan Zainal (Malaysia National Team) 2'14:59s
TIGA PELUMBA TERBAIK KESELURUHAN (Jersi Kuning):
1. Libardo Nino Corredor (Le Tua Cycling Team) 18'14:45s
2. Jonnatha Monsalve (Androni Giocattoli) 18'14:47s
3. Emanuele Sella (Androni Giocattoli) 18'15:04s
TIGA PELUMBA TERBAIK ASIA (Jersi Putih):
1. Libardo Nino Corredor (Le Tua Cycling Team) 18'14:45s
2. Jonnatha Monsalve (Androni Giocattoli) 18'14:47s
3. Emanuele Sella (Androni Giocattoli) 18'15:04s
TIGA PELUMBA TERBAIK ASIA (Jersi Putih):
1. Rahim Emami (Azad University Cycling Team) 18'15:07s
2. Ghader Mizbani (Tabriz Petrochemical Team) 18'15:35s
3. Hossein Askari (Tabriz Petrochemical Team) 18'15:37s
RAJA PECUT (Jersi Biru):
1. Anuar Manan (Terengganu Pro Asia Cycling Team) 70 mata
2. Andrea Guardini (Farnese Vini-NeriSottoli) 69 mata
3. Boris Shpilevsky (Tabriz Petrochemical Team) 35 mata
RAJA BUKIT (Jersi Merah):
1. Jonnatha Monsalve (Androni Giocattoli) 45 mata
2. Rahim Emami (Azad University Cycling Team) 35 mata
3. Libardo Nino Corredor (Le Tua Cycling Team) 28 mata
PASUKAN TERBAIK KESELURUHAN:
2. Ghader Mizbani (Tabriz Petrochemical Team) 18'15:35s
3. Hossein Askari (Tabriz Petrochemical Team) 18'15:37s
RAJA PECUT (Jersi Biru):
1. Anuar Manan (Terengganu Pro Asia Cycling Team) 70 mata
2. Andrea Guardini (Farnese Vini-NeriSottoli) 69 mata
3. Boris Shpilevsky (Tabriz Petrochemical Team) 35 mata
RAJA BUKIT (Jersi Merah):
1. Jonnatha Monsalve (Androni Giocattoli) 45 mata
2. Rahim Emami (Azad University Cycling Team) 35 mata
3. Libardo Nino Corredor (Le Tua Cycling Team) 28 mata
PASUKAN TERBAIK KESELURUHAN:
1. Azad University Cycling Team 54'48:30s
2. Tabriz Petrochemichal Team +04s
3. Chipotle Development Team +32s
PASUKAN TERBAIK ASIA:
1. Azad University Cycling Team 54'48:30s
2. Max Success Cycling Team +9:35s
3. Tabriz Petrochemical Team +14:03s
2. Tabriz Petrochemichal Team +04s
3. Chipotle Development Team +32s
PASUKAN TERBAIK ASIA:
1. Azad University Cycling Team 54'48:30s
2. Max Success Cycling Team +9:35s
3. Tabriz Petrochemical Team +14:03s
Stage 7 - Banting to Tampin
Saturday, 29 January 2011 | 149.5 km
Start venue: Jalan Sultan Abdul Samad, Banting
Start time: 1100 hrs
Finish venue: Main Street, Tampin
Estimated time of arrival: 1410 hrs
• Stage 7 Rider List
Stage Summary
Stage 7 - January 29 - Banting-Tampin (149.5km)
If there are little gaps to be made up in the general classification, do not be surprised if it does happen over this and the next two stages. Though seemingly flat in nature, the coastal roads and undulations along this stage heading to the finish in Tampin, does provide an opportunity for breakaways to do some damage.
The stage begins on a coastal route from the start in Banting, heading towards the popular West Coast beach resort of Morib, then on to Tanjung Gadong and into Sungai Pelek where the first intermediate sprint awaits the peloton at the 44.6km point. About 13.3km later, the stage's only KOM section, a category 4 climb up Bukit Pelandok emerges. After that it is back towards the coast and into the other popular West Coast beach resort of Port Dickson where the second intermediate sprint awaits.
The race heads inland from then on, through undulations that cover the route towards the category 4 climb at Linggi after 105.7km. Cool rural winds will then serenade the peloton as it drives on towards the third intermediate sprint in Chembong after 124.7km and on past Rembau towards the finish line in Tampin.
Stage | Date | Start and Finish | Distance |
Stage 1 | Sunday, 23 January 2011 | Dataran Helang - Pekan Kuah | 94.3 kms |
| |||
Stage 2 | Monday, 24 January 2011 | Kangar - Butterworth | 145.0 kms |
Stage 3 | Tuesday, 25 January 2011 | Taiping - Sitiawan | 144.9 kms |
Stage 4 | Wednesday, 26 January 2011 | Ayer Tawar - Cameron Highlands | 137.6 kms |
Stage 5 | Thursday, 27 January 2011 | Tapah - Genting Highlands | 124.3 kms |
Stage 6 | Friday, 28 January 2011 | Rawang - Putrajaya | 107.0 kms |
Stage 7 | Saturday, 29 January 2011 | Banting - Tampin | 149.5 kms |
Stage 8 | Sunday, 30 January 2011 | Kuala Pilah - Jasin | 156.5 kms |
Stage 9 | Monday, 31 January 2011 | Melaka - Nilai | 151.7 kms |
Stage 10 | Tuesday, 1 February 2011 | UITM Shah Alam - KL Loop | 104.6 kms |
0 comments:
Post a Comment